Demolition Permits in the Last 30 Days

Commercial, industrial, and residential demolition permits in the last 30 day period

All demolition permits issued from Sep 18, 2019 - Oct 18, 2019:

Overview

Total number issued 110
Total estimated value $312,178.00
Avg. days to issue 45

Map of Permits Issued

Showing % of City-Wide Value.


  • < .1%

  • < 2.5%

  • >= 2.5%

Permit Data

Issue Date Description Estimated Cost Days to Issue
10/17/2019 0.0000 0
10/16/2019 BRICK 500.0000 0
10/16/2019 PRIVATE VACANT 2 STORY, 2 UNIT BRICK. DEMO AS SOON AS POSSIBLE; COORDINATE WITH POLICE TO ENSURE BUILDING IS EMPTY. 0.0000 15
10/16/2019 LRA 2/STY BRICK 2/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 98
10/16/2019 LRA 1 STORY, 1 UNIT BRICK - TO BE DEMOED WITH 4348 ASHLAND 0.0000 40
10/16/2019 LRA 2 STORY, 1 UNIT BRICK. LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 83
10/16/2019 LRA 1.5 STORY, 1 UNIT FRAME. LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 83
10/16/2019 LRA 1 STORY, 1 UNIT FRAME. LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 83
10/16/2019 BRICK 23469.0000 0
10/16/2019 LRA 2 STORY, 1 UNIT FRAME. 0.0000 23
10/16/2019 PRIVATELY-OWNED VACANT 2 STORY, 1 UNIT FRAME. 0.0000 23
10/16/2019 LRA 1 STORY, 1 UNIT BRICK. 0.0000 23
10/16/2019 LRA 1 STORY, 1 UNIT FRAME. 0.0000 23
10/16/2019 LRA 1 STORY, 1 UNIT FRAME. 0.0000 23
10/16/2019 LRA 1 STORY, 1 UNIT FRAME. 0.0000 23
10/16/2019 PRIVATELY-OWNED VACANT 1 STORY, 1 UNIT BRICK. 0.0000 23
10/16/2019 LRA 1.5 STORY, 1 UNIT BRICK. 0.0000 23
10/16/2019 LRA 1 STORY, 1 UNIT BRICK. 0.0000 23
10/16/2019 PRIVATE, VACANT 1 STORY, 1 UNIT FRAME. 0.0000 17
10/16/2019 PRIVATELY-OWNED VACANT 2 STORY, 1 UNIT FRAME. 0.0000 23
10/15/2019 BRICK 16989.0000 0
10/15/2019 BSMT=YES 60000.0000 0
10/14/2019 14335.0000 0
10/12/2019 LRA 2 STORY, 1 UNIT FRAME. 0.0000 42
10/12/2019 LRA 2 STORY, 1 UNIT BRICK. 0.0000 42
10/12/2019 LRA 1 STORY, 2 UNIT BRICK. LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 55
10/11/2019 LRA 1.5/STY BRICK 1/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 93
10/11/2019 2 STORY, 2 FAMILY HOUSE 12250.0000 0
10/11/2019 LRA 2/STY BRICK 2/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 22
10/11/2019 9745.0000 0
10/10/2019 LRA 2/STY BRICK 4/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 119
10/09/2019 2-STORY, FRAME, INTERIOR FIRE DAMAGED, WALL COLLAPSED 0.0000 23
10/09/2019 1-STY, 1-FAM, BRICK 0.0000 23
10/08/2019 2 STORY RSIDENTIAL 6800.0000 0
10/08/2019 LRA 1-STORY 1-UNIT BRICK. LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. CONTRACTOR REQUIRED TO MEET DEMOLITION SPECIFICATIONS OF THE URBAN GREENING PROGRAM. BIDS WILL ONLY BE ACCEP 0.0000 82
10/08/2019 LRA 1-STORY 1-UNIT BRICK. LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. CONTRACTOR REQUIRED TO MEET DEMOLITION SPECIFICATIONS OF THE URBAN GREENING PROGRAM. BIDS WILL ONLY BE ACCEP 0.0000 82
10/08/2019 LRA 1-STORY 1-UNIT BRICK. LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. CONTRACTOR REQUIRED TO MEET DEMOLITION SPECIFICATIONS OF THE URBAN GREENING PROGRAM. BIDS WILL ONLY BE ACCEP 0.0000 82
10/08/2019 LRA 1-STORY 1-UNIT BRICK. LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. CONTRACTOR REQUIRED TO MEET DEMOLITION SPECIFICATIONS OF THE URBAN GREENING PROGRAM. BIDS WILL ONLY BE ACCEP 0.0000 82
10/08/2019 2 STORY RESIDENTIAL 12250.0000 0
10/08/2019 1305-07 N TAYLOR, LRA 2 STY, BRICK 0.0000 63
10/07/2019 LRA BRICK, COLLAPSING. 0.0000 25
10/07/2019 BRICK 14800.0000 0
10/07/2019 LRA 2 STORY, 1 UNIT BRICK. 0.0000 37
10/07/2019 LRA 2 STORY, 1 UNIT FRAME. 0.0000 37
10/07/2019 LRA 1 STORY, 1 UNIT BRICK. 0.0000 37
10/06/2019 LRA 2 STY, BRICK - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 114
10/06/2019 LRA 2 STY, BRICK - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 114
10/06/2019 LRA 2 STY, BRICK - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 114
10/06/2019 PRIVATELY OWNED 2 STY,BRICK. REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, DEMO MUST BE COMPLETED IN ACCORDANCE WITH DEMOLITION ORDINANCE AND ATTACHED HANDBOOK. LATE FEES WILL BE APPLIED, 0.0000 114
10/06/2019 LRA 2 STY, BRICK - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 114
10/06/2019 LRA 2 STY, BRICK - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 114
10/06/2019 LRA 2 STY, BRICK - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 114
10/06/2019 16500.0000 0
10/04/2019 LRA 1/STY BRICK 1/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 86
10/04/2019 5063-5 PLOVER IS A 1 STORY, 2 UNIT DUPLEX WITH A GREAT DEAL OF CONCRETE. 0.0000 2
10/04/2019 LRA 2/STY BRICK 2/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 93
10/04/2019 LRA 2/STY BRICK 4/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 93
10/04/2019 LRA 2/STY BRICK 4/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 93
10/04/2019 LRA 1/STY BRICK 1/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 86
10/04/2019 LRA 2/STY BRICK 4/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 86
10/03/2019 LRA 2/STY BRICK 4/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 112
10/02/2019 LRA 1.5 STORY, 1 UNIT FRAME. LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 45
10/02/2019 LRA 2 STORY, 1 UNIT BRICK. 0.0000 25
10/02/2019 LRA 2 STORY, 1 UNIT BRICK. 0.0000 25
10/01/2019 LRA 1 STY, FRAME - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 111
10/01/2019 BRICK 0.0000 0
09/30/2019 0.0000 0
09/30/2019 LRA 3 STORY, 1 UNIT BRICK. LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 60 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 36
09/30/2019 LRA 2/STY BRICK 4/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 81
09/30/2019 LRA 2/STY BRICK 4/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 18
09/30/2019 BUILDING WITH BASEMENT 8890.0000 0
09/27/2019 BRICK 0.0000 0
09/27/2019 0.0000 0
09/27/2019 1-STORY, 1-UNIT, BRICK, INTERIOR STRUCTURE FIRE 0.0000 31
09/26/2019 LRA 1.5 STY BRICK - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 149
09/26/2019 HOUSE 0.0000 0
09/25/2019 SINGLE FAMILY 1 STORY BRICK 16500.0000 0
09/25/2019 2801-11 N SARAH - LRA 2/STY BRICK - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 168
09/25/2019 LRA 2/STY BRICK 2/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 138
09/25/2019 LRA 2/STY BRICK 2/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 138
09/25/2019 LRA 2/STY BRICK 2/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 138
09/25/2019 LRA 2/STY BRICK 2/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 138
09/25/2019 LRA 2/STY BRICK 2/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 138
09/24/2019 0.0000 0
09/24/2019 LRA 2/STY BRICK 2/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 132
09/24/2019 0.0000 0
09/23/2019 PRIVATE / LRA DONATION 1/STY BRICK 1/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 124
09/23/2019 2 STORY BRICK TOWNHOUSE 0.0000 0
09/23/2019 COMPLETELY DESTROYED 0.0000 0
09/20/2019 +BASEMENT 0.0000 0
09/20/2019 PRIVATELY-OWNED VACANT BUILDING. FIRE DAMAGE, COLLAPSED, AND USED FOR DUMPING MATTRESSES. ENTIRE PARCEL SHOULD BE CLEANED AND CLEARED WITH THE BUILDING DEMO. 0.0000 20
09/20/2019 1 STY, BRICK 0.0000 14
09/20/2019 1 STY, BRICK 0.0000 14
09/20/2019 1 STY, BRICK 0.0000 14
09/20/2019 LRA 1/STY FRAME 1/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 72
09/20/2019 LRA 2 STORY, 1 UNIT BRICK. PRIORITY #1. 0.0000 20
09/20/2019 LRA 2 STORY, 2 UNIT BRICK. 0.0000 20
09/20/2019 LRA 2 STORY, 4 UNIT BRICK. 0.0000 20
09/20/2019 LRA 2 STORY, 2 UNIT BRICK. PRIORITY #2 - COLLAPSING BACK. 0.0000 20
09/19/2019 1.5 STORY , FRAME , 1 UNIT + NO BASEMENT 0.0000 0
09/19/2019 2 STORY BRICK SINGLE FAMILY, NO BASEMENT 10000.0000 0
09/19/2019 LRA 2 STORY, 1 UNIT BRICK. LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 19
09/19/2019 LRA 1 STORY, 1 UNIT BRICK. LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 19
09/19/2019 LRA 2 STORY, 1 UNIT BRICK. LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 19
09/19/2019 LRA 1/STY FRAME 1/FAM - LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 30
09/19/2019 32350.0000 0
09/19/2019 LRA 1 STORY, 1 UNIT BRICK. LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 19
09/19/2019 LRA 1 STORY, 1 UNIT BRICK. LRA REQUIRES $1M/$2M GL INSURANCE AND WORKERS COMP, CONTRACT MUST BE SIGNED WITH LRA. DEMO MUST BE COMPLETED IN 90 DAYS. THIS IS A STANDARD LRA/CITY DEMOLITION: SEE ATTACHED LRA SPECIFICATIONS. 0.0000 19
09/18/2019 1 STORY, 1 FAMILY 0.0000 0
09/18/2019 56800.0000 0