Board Bill Number 71 In Session 2021-2022
City Foundry Saint Louis Tax Increment Financing (TIF) Second Amended RPA 2 Redevelopment Plan
Summary
This Board Bill will approve the City Foundry Saint Louis Tax Increment Financing (TIF) Second Amended RPA 2 Redevelopment Plan. The City Foundry Saint Louis TIF was approved in 2017 by passage of Ordinance No. 70431. The Redevelopment Area described in the Redevelopment Plan was originally divided into four Redevelopment Project Areas ("RPA"). TIF was adopted in RPA 1 upon passage of Ordinance No. 70431. In 2019, by passage of Ordinance No. 70750, the Redevelopment Plan was amended to rearrange RPA boundaries and describe a more detailed redevelopment proposal for RPA 2. The City Foundry Saint Louis Tax Increment Financing (TIF) Second Amended RPA 2 Redevelopment Plan further amends the Redevelopment Plan with respect to RPA 2 only. The first phase of the RPA 2 redevelopment project, consisting of an approximately 46,000 square foot dining and entertainment building (the "Alamo Drafthouse Building") is under construction; however, the remainder of RPA 2 is still vacant. The proposed amendment to the Redevelopment Plan will revise the scope of the redevelopment project for RPA 2 to include: • Completion of the Alamo Drafthouse Building. • Construction of approximately (a) 37,000 square feet of retail space, (b) 59,000 square feet of office space, (c) 280 residential apartments, and (d) 492 structured parking spaces in the remainder of RPA 2. • Increase in the total TIF assistance from $17,259,000 to $18,000,000. • $60 million+ increase in private investment, resulting in the percentage of total costs funded by TIF decreasing from 17.7 percent to 11.25 percent of total costs.
Download
Latest Bill text:
- Introduced (2.84 MB PDF)
Overview
Session: 2021-2022
Introduced: 07/01/2021
Primary Sponsors: Tina (Sweet-T) Pihl
Latest Activity: Register Returns Notice with Ordinance Number
Ordinance: 71375 effective 08/30/2021
Legislative History
Legislative activities and outcomes for this board bill. Learn more about what these activities mean.
-
07/01/2021
First Reading
Bill text was introduced (2.84 MB PDF).
07/01/2021Referred to a Committee
The bill was assigned to the Housing, Urban Development and Zoning Committee.
07/07/2021Committee Hearing
The bill was passed out of committee with a recommendation of do pass during the Housing, Urban Development and Zoning Committee hearing.
07/09/2021Second Reading
07/13/2021Perfection
The bill was passed.
07/15/2021Engrossment
The bill was engrossed during the Engrossment, Rules, Resolutions and Credentials Committee.
07/16/2021Third Reading
The bill was passed.
07/16/2021Delivered to Mayor
08/02/2021Mayor Returns Bill
The bill was approved.
08/03/2021Feedback is anonymous.5 comments from people like you have helped us improve this page. Keep the feedback coming!
You are leaving the City of St. Louis website
You should be redirected in a few seconds. If this fails, here's the link: