Board Bill Number 133 In Session 2024-2025
Laurel and Waterman Bridge
Summary
This bill authorizes and directs the City of St. Louis to let contracts and provide for design, right-of-way acquisition, and construction for the Laurel and Waterman Bridge Over Metrolink; Traffic Management Enhancements Ph. 7 - South Broadway (Marceau to Carroll); Traffic Management Enhancements Ph. 8 - North Broadway (Cass to Riverview); River Des Peres Boulevard Improvements (Lansdowne to Gravois); and American with Disabilities Act (ADA) Bus Stop Compliance Collaboration on Grand Avenue (Holly Hills to Hall Street), Delmar Boulevard (Hodiamont to Kingshighway), and Cass Avenue (Grand to Kingshighway). The bill also authorizes the City of St. Louis to enter into supplemental agreements with the Missouri Highway and Transportation Commission, Federal Highway Administration, utilities, railroads, Bi-State Development Agency, Land Clearance for Redevelopment Authority (LCRA), Great Rivers Greenway District (GRG), Greater St. Louis, Inc., and other governmental agencies and parties as necessary for the completion of the projects.
Download
Latest Bill text:
- Introduced (1.17 MB PDF)
Overview
Session: 2024-2025
Introduced: 11/15/2024
Primary Sponsors: Anne Schweitzer
Latest Activity: Perfection
Co-Sponsors:
Legislative History
Legislative activities and outcomes for this board bill. Learn more about what these activities mean.
-
11/15/2024
First Reading
Bill text was introduced (1.17 MB PDF).
11/15/2024Referred to a Committee
The bill was assigned to the Public Infrastructure and Utilities Committee.
11/20/2024Committee Hearing
The bill was passed out of committee with a recommendation of do pass during the Public Infrastructure and Utilities Committee hearing.
11/22/2024Second Reading
12/06/2024Perfection
The bill was passed.
5 comments from people like you have helped us improve this page. Keep the feedback coming!
You are leaving the City of St. Louis website
You should be redirected in a few seconds. If this fails, here's the link: