Gallery Contents
4101 Blaine

The Botanical Heights Neighborhood Playground had been built on the site of a former 1932 Thurman-Blaine filling station. The site also contained the Schneider Ambrose Auto Repair service at the rear of the filling station. SLDC received a $960,000 grant for the Brownfields Cleanup Fund, provided through the American Recovery and Reinvestment Act. A $25,000 sub-grant was awarded to the Garden District Commission to cover certain costs associated with removing underground storage tanks and petroleum-impacted soil.
Photo by Amy Lampe

Underground Storage Tank (USTs) closure activities being performed. Two steel 560-gallon tanks and one steel 845-gallon tank, as well as piping, were found and removed from the site.
Photo by Amy Lampe

A Geoprobe prepares to take soil and groundwater samples on the site. Soil samples for benzene, ethylbenzene, naphthalene, xylenes, or total petroleum hydrocarbons (TPH)-gasoline range organics (GRO), as well as lead concentrations, had previously exceeded default target levels defined by the Missouri Department of Natural Resources. SLDC and the Garden District Commission continue to work with the MDNR to achieve regulatory closure of the site.
Photo by Amy Lampe

The completed Botanical Heights Neighborhood Playground, after environmental cleanup had been completed and the site had been developed.
Photo by Evin Russell





More Photos and Videos
View all videos and photo galleries