BPS Projects in Design

Project profiles of select projects managed by the Design Division of the Department of the President of the Board of Public Service.

Federally Funded Projects
Federally funded transportation improvement projects in the City of St. Louis.

Goodfellow Traffic Calming Study
At the request of the 27th Ward Alderwoman, the President's Office of the City of St. Louis Board of Public Service has contracted with CBB to provide traffic engineering study services for traffic calming solutions proposed to Goodfellow (I-70 to Hall Ferry Circle).

Gravois-Jefferson to Shenandoah Study
Gravois Avenue Safety Study (Jefferson to Shenandoah)

Hampton Avenue Traffic Study
Hampton Avenue traffic study from Chippewa to Gravois.

Hodiamont Cycle Track Improvement Project
The City of St. Louis is embarking on this interim project to make a cycle track connection between the MetroLink station at Delmar and the Hodiamont Tracks at Gwen B. Giles Park.

Ivory Triangle Traffic Study
The City of St. Louis is pursuing a traffic study at the Ivory Triangle location within the Patch Neighborhood, consisting of the Ivory St., Virginia Ave., Courtois St., Schirmer St., and Steins St. intersections.

Jamieson Traffic Study
Alderman Oldenburg initiated a traffic study along Jamieson Ave. from Chippewa to Hampton to reduce speeding and erratic driving behavior though the corridor

Jefferson / 22nd Traffic Flow and Corridor Improvements
March 16, 2020 public open house materials. Public Comments were due on March 30, 2020.

Lindell Boulevard Safety Improvements
At the request of the 28th Ward Alderwoman, the President's Office of the City of St. Louis Board of Public Service has contracted with CBB to provide traffic engineering design services for improvements proposed to Lindell Boulevard (Skinker to Kingshighway).

Loughborough Pedestrian Crossings and Traffic Calming Improvements
Pedestrian improvements and traffic calming on Loughborough Avenue along the south edge of Carondelet Park.

N. Kingshighway Blvd. (Lindell to Dr. MLK) Traffic Study
UPDATED: Recommendations from the traffic study for N. Kingshighway Blvd. (Lindell to Dr. Martin Luther King) as presented at the June 22 and August 31, 2022 public meetings. The public comment period is now closed. There will be additional opportunity for public comment as individual projects progress through design.

Principal Arterial Traffic Safety Enhancements
The City of St. Louis is pursuing over $ 46,000,000 in improvements to address speeding, crash concentrations, and pedestrian and alternative movements throughout approximately 30 miles of corridors and select intersections in the City.

River Des Peres Corridor Traffic Study
The City of St. Louis Board of Public Service has contracted with Lochmueller Group to evaluate traffic conditions along River Des Peres Blvd between Lansdowne Ave and Gravois Ave and recommend strategies to slow motor vehicle traffic, reduce crashes, and create a safer and more welcoming environment for all roadway users.

South Broadway Cycle Track Improvements
The City of St. Louis was awarded funding via East-West Gateway through the Congestion Mitigation and Air Quality Program (CMAQ) to construct an upgraded bike facility, as well as related road and sidewalk improvements, on approximately 2.1 miles of South Broadway between River City Casino Blvd. and Dover Street.

Union-Lindell Bridge Reconstruction
The intersection of Union and Lindell Boulevards, minor arterial streets, is supported on two independent bridge structures spanning Forest Park Parkway, an east-west principal arterial, and MetroLink light rail tracks.

Ward 14 Traffic Study Calming Devices Recommendations
Design recommendations for traffic calming devices in the 14th Ward.

Was this page helpful?      



Comments are helpful!
500 character limit

Feedback is anonymous.

1 comment from someone like you has helped us improve this page. Keep the feedback coming!