Capital Improvements Projects

Profiles of select projects managed by the Design Division of the Department of the President of the Board of Public Service.

Public Engagement

    No events available.

Projects

Projects in the planning, design and construction phases are below.

  • Christy Blvd Cycle Track Study Map detailing Christy Blvd Cycle Track Study route. This study will determine the the possibility of adding bicycle stations on Christy Blvd from Kingshighway Blvd to Holly Hills Blvds and from Holly Hills Blvd from Christy Blvd to Gravois Ave. Planning Stage in Ward 1, Ward 2, Ward 5
  • Hodiamont Cycle Track Improvement Project The City of St. Louis is embarking on this interim project to make a cycle track connection between the MetroLink station at Delmar and the Hodiamont Tracks at Gwen B. Giles Park. Construction Stage in Ward 10
  • Ivory Triangle Traffic Study The City of St. Louis is pursuing a traffic study at the Ivory Triangle location within the Patch Neighborhood, consisting of the Ivory St., Virginia Ave., Courtois St., Schirmer St., and Steins St. intersections. Planning Stage in Ward 1
  • Jamieson Traffic Study Traffic Calming/Road Diet efforts along Jamieson Ave from Chippewa to Hampton Construction Stage in Ward 1
  • Jefferson / 22nd Traffic Flow and Corridor Improvements March 16, 2020 public open house materials. Public Comments were due on March 30, 2020. Planning Stage in Ward 14
  • Loughborough Pedestrian Crossings and Traffic Calming Improvements Pedestrian improvements and traffic calming on Loughborough Avenue along the south edge of Carondelet Park. Planning Stage in Ward 1
  • Principal Arterial Traffic Safety Enhancements The City of St. Louis is pursuing over $ 46,000,000 in improvements to address speeding, crash concentrations, and pedestrian and alternative movements throughout approximately 30 miles of corridors and select intersections in the City. Construction Stage in Ward 1, Ward 2, Ward 3, Ward 4, Ward 5, Ward 6, Ward 7, Ward 8, Ward 9, Ward 10, Ward 11, Ward 12, Ward 13, Ward 14
  • River Des Peres and Carondelet Corridor Study 1st Ward Alderwoman Schweitzer and 2nd Ward Alderman Oldenburg initiated a traffic study that would evaluate traffic conditions along the corridor. Planning Stage in Ward 1, Ward 2
  • River Des Peres Corridor Traffic Study The Board of Public Service has contracted with Lochmueller Group to evaluate traffic conditions along River Des Peres Blvd between Lansdowne Ave and Gravois Ave and recommend strategies. Planning Stage in Ward 1, Ward 2
  • South Broadway Cycle Track Improvements The City of St. Louis was awarded funding to construct an upgraded bike facility, as well as related road and sidewalk improvements, on approximately 2.1 miles of South Broadway between River City Casino Blvd. and Dover Street. Planning Stage in Ward 1
  • Tucker Boulevard Cycle Track Project The Tucker Blvd Cycle Track will consist of a 2-way, street level, physically protected bicycle and scooter facility on the existing asphalt pavement along the west side of North Tucker Boulevard between Washington Avenue  and Chouteau Avenue. Planning Stage in Ward 8, Ward 14
  • Union-Lindell Bridge Reconstruction The intersection of Union and Lindell Boulevards, minor arterial streets, is supported on two independent bridge structures spanning Forest Park Parkway, an east-west principal arterial, and MetroLink light rail tracks. Design Stage in Ward 9, Ward 10

Related News

Contact

Board of Public Service

bps-info@stlouis-mo.gov

(314) 622-3535

1200 Market St, City Hall, Rm 301
St. Louis, MO 63103

8:00 a.m. - 5:00 p.m. M - F

Contact the Board of Public Service

Was this page helpful?      



Comments are helpful!
500 character limit

Feedback is anonymous.