Board Bill Number 93 | Session 2022-2023

Redevelopment Plan for the Cass Ave./N. 14th St./O’Fallon St./Hogan St. Redevelopment Area

Summary

This Board Bill seeks to approve a Chapter 99 Redevelopment Plan and Blighting Study for the Cass Ave./N. 14th St./O'Fallon St./Hogan St. Redevelopment Area. The proposed redevelopment consists of selective demolition, the construction of new multi-family buildings and the renovation of several of the existing multi-family buildings in the Carr Square neighborhood. The prospective redeveloper plans four phases of development, and the first phase has begun with constructing 45 new units, and renovating 86 of the existing units, all ranging from 1-3 bedrooms, at the cost of $ 17.9 million.. This Board Bill will allow for up to a 15-year tax abatement at 75 percent.

Download

Lastest Bill text:

Overview

Session: 2022-2023

Introduced: 09/23/2022

Sponsor: James Page

Latest Activity: Perfection

Legislative History

Legislative activities and outcomes for this board bill. Learn more about what these activities mean.

  • 09/23/2022

    First Reading

    Bill text was introduced (2.33 MB PDF).

  • 09/23/2022

    Referred to a Committee

    The bill was assigned to the Housing, Urban Development and Zoning Committee.

  • 11/17/2022

    Committee Hearing

    The bill was passed out of committee with a recommendation of do pass during the Housing, Urban Development and Zoning Committee hearing.

  • 11/18/2022

    Second Reading

  • 12/01/2022

    Perfection

    The bill was placed on the informal calendar.

  • 12/13/2022

    Perfection

    The bill was placed on the informal calendar.

  • 01/13/2023

    Perfection

    The bill was placed on the informal calendar.

  • 01/20/2023

    Perfection

    The bill was placed on the informal calendar.