Board Bill Number 38 In Session 2025-2026
St. Louis Works
Summary
An Ordinance recommended by the Board of Public Service authorizing the 2024 St. Louis Works and the 50/50 Sidewalk Programs City Wide providing for the construction and reconstruction of gutters, streets, driveways, sport curbs, sidewalks, alleys, traffic controls, beautification, tree planting, resurfacing and related engineering adjustments listed herein, appropriating $5,200,000.00 from the Street Improvement Fund; containing sections for description of the work, approval of plans and specification, work and materials guarantees, estimated costs from City funds and supplemental agreements and reversions authorizations applicable state and federal wage rate requirements, equal opportunity provisions, the Mayor's Executive Orders, contract advertising statutes, and public work emergency clause.
Download
Latest Bill text:
- Introduced (1.00 MB PDF)
Overview
Session: 2025-2026
Introduced: 06/13/2025
Primary Sponsors: Michael Browning
Latest Activity: Committee Hearing
Legislative History
Legislative activities and outcomes for this board bill. Learn more about what these activities mean.
-
06/13/2025
First Reading
Bill text was introduced (1.00 MB PDF).
06/13/2025Referred to a Committee
The bill was assigned to the Public Infrastructure and Utilities Committee.
06/18/2025Committee Hearing
The bill was passed out of committee with a recommendation of do pass during the Public Infrastructure and Utilities Committee hearing.
5 comments from people like you have helped us improve this page. Keep the feedback coming!
You are leaving the City of St. Louis website
You should be redirected in a few seconds. If this fails, here's the link: