Board Bill Number 208 In Session 2023-2024

Easement for the Metropolitan St. Louis Sewer District

Summary

An Ordinance authorizing and directing the Mayor and the Comptroller of the City of Saint Louis to execute a permanent, irrevocable Easement, which shall give, grant, extend and confer on the Metropolitan St. Louis Sewer District, its agents, successors, and assigns, the exclusive right to build and maintain a sewer or sewers, including storm water improvements on the strip or strips of ground described, and in Lot "A" of Belle Crest Plat Book, and containing an emergency clause.

Download

Latest Bill text:

Overview

Session: 2023-2024

Introduced: 02/02/2024

Primary Sponsors: Anne Schweitzer

Latest Activity: Delivered to Register

Legislative History

Legislative activities and outcomes for this board bill. Learn more about what these activities mean.

  • 02/02/2024

    First Reading

    Bill text was introduced (1.43 MB PDF).

  • 02/02/2024

    Referred to a Committee

    The bill was assigned to the Public Infrastructure and Utilities Committee.

  • 02/07/2024

    Committee Hearing

    The bill was passed out of committee with a recommendation of do pass during the Public Infrastructure and Utilities Committee hearing.

  • 02/09/2024

    Second Reading

  • 02/16/2024

    Perfection

    The bill was passed.

  • 02/23/2024

    Engrossment

    The bill was engrossed during the Engrossment, Rules, Resolutions and Credentials Committee.

  • 02/23/2024

    Third Reading

    The bill was passed.

  • 02/23/2024

    Delivered to Mayor

  • 03/13/2024

    Mayor Returns Bill

    The bill was approved.

  • 03/13/2024

    Delivered to Register

Votes

02/23/2024 Vote Results

Aye Votes 15
No Votes 0
Final Passage Vote

View vote details

Was this page helpful?      



Comments are helpful!
500 character limit

Feedback is anonymous.

5 comments from people like you have helped us improve this page. Keep the feedback coming!