Board Bill Number 208 In Session 2023-2024
Easement for the Metropolitan St. Louis Sewer District
Summary
An Ordinance authorizing and directing the Mayor and the Comptroller of the City of Saint Louis to execute a permanent, irrevocable Easement, which shall give, grant, extend and confer on the Metropolitan St. Louis Sewer District, its agents, successors, and assigns, the exclusive right to build and maintain a sewer or sewers, including storm water improvements on the strip or strips of ground described, and in Lot "A" of Belle Crest Plat Book, and containing an emergency clause.
Download
Latest Bill text:
- Introduced (1.43 MB PDF)
Overview
Session: 2023-2024
Introduced: 02/02/2024
Primary Sponsors: Anne Schweitzer
Latest Activity: Register Returns Notice with Ordinance Number
Ordinance: 71810 effective 03/13/2024
Legislative History
Legislative activities and outcomes for this board bill. Learn more about what these activities mean.
-
02/02/2024
First Reading
Bill text was introduced (1.43 MB PDF).
02/02/2024Referred to a Committee
The bill was assigned to the Public Infrastructure and Utilities Committee.
02/07/2024Committee Hearing
The bill was passed out of committee with a recommendation of do pass during the Public Infrastructure and Utilities Committee hearing.
02/09/2024Second Reading
02/16/2024Perfection
The bill was passed.
02/23/2024Engrossment
The bill was engrossed during the Engrossment, Rules, Resolutions and Credentials Committee.
02/23/2024Third Reading
The bill was passed.
02/23/2024Delivered to Mayor
03/13/2024Mayor Returns Bill
The bill was approved.
03/13/2024Feedback is anonymous.5 comments from people like you have helped us improve this page. Keep the feedback coming!
You are leaving the City of St. Louis website
You should be redirected in a few seconds. If this fails, here's the link: