Ordinance 71701
Board of Public Service (BPS) Multiple Public Works Projects
Summary
This bill authorizes and directs the City of St. Louis to let contracts and provide for design, right-of-way acquisition, and construction for the Tower Grove Connector, Phase 2 (Sarah Street from Vandeventer Avenue to Forest Park Avenue); Lindell/Union Bridge Reconstruction Over Metrolink and Forest Park Parkway; Traffic Management Enhancements, Phase 5 (Delmar Boulevard from DeBaliviere Avenue to Vandeventer Avenue); and Louisiana Calm Streets, Phase 2 (Meramec Street to Holly Hills Avenue).
Download
Overview
Co-Sponsors:
President Megan E Green
Legislative History
Legislative activities and outcomes for this board bill. Learn more about what these activities mean.
-
06/09/2023
First Reading
Bill text was introduced (772.45 KB PDF).
06/09/2023Referred to a Committee
The bill was assigned to the Public Infrastructure and Utilities Committee.
06/14/2023Committee Hearing
The bill was passed out of committee with a recommendation of do pass during the Public Infrastructure and Utilities Committee hearing.
The bill text was changed:
- Committee Substitute (769.34 KB PDF)
06/15/2023Second Reading
06/23/2023Perfection
The bill was passed.
06/30/2023Engrossment
The bill was engrossed during the Engrossment, Rules, Resolutions and Credentials Committee.
06/30/2023Third Reading
The bill was passed.
06/30/2023Delivered to Mayor
07/12/2023Mayor Returns Bill
The bill was approved.
07/13/2023Delivered to Register
07/18/2023Register Returns Notice with Ordinance Number
Register returns ordinance number 71701. Effective date is 07/12/2023
Topics
Feedback is anonymous.
You are leaving the City of St. Louis website
You should be redirected in a few seconds. If this fails, here's the link: