Board Bill Number 285 Votes In Session 2015-2016

Traffic Management Enhancement bill

Board Bill

BOARD BILL NO. 285 SPONSORED BY ALDERMAN KENNETH ORTMANN, ALDERMAN JOHN COATAR, ALDERWOMAN CAROL HOWARD, ALDERWOMAN MARLENE DAVIS, ALDERMAN THOMAS VILLA, ALDERMAN LARRY ARNOWITZ, ALDERWOMAN CHRISTINE INGRASSIA, ALDERMAN ANTONIO FRENCH, ALDERMAN SAMUEL MOORE, ALDERMAN CHRIS CARTER An Ordinance, recommended by the Board of Public Service of the City of St. Louis (the "Board of Public Service"), establishing a public works project for the Traffic Management Enhancements – Phase 3 which improves upon the means for the City to manage traffic and safety within the transportation network including the establishment of a new Real-Time Transportation Intelligence Center located at 1915 Olive Street (the “PROJECT”); authorizing and directing the City of St. Louis (the "CITY"), by and through its Board of Public Service, to let contracts and provide for the design, construction, materials, and equipment for the PROJECT; authorizing the Board of Public Service to employ labor and consultants, pay salaries, fees and wages, as necessary for completion of the PROJECT, and to enter into supplemental agreements with the Missouri Highway and Transportation Commission, Federal Highway Administration, utilities, railroads, and other governmental agencies as necessary for completion of the PROJECT, all in accordance with the federal Transportation Equity Act for the 21st Century (23 U.S.C. § 110, et seq.), these agreements may include, but are not limited to, sections for: description of the work, material guarantees, estimated expenditure allocations, fund reversion authorization, applicable federal and state wage rate requirements, equal opportunity provisions, the Mayor’s Executive Orders, and contract advertising statutes; requiring that all work provided for herein shall be carried out in accordance with detailed plans and specifications adopted and approved by the Board of Public Service before bids are advertised therefor; directing that all construction contracts let by authority of this Ordinance provide for federal and state prevailing wage requirements, including prevailing wage holiday and overtime pay, and compliance with all applicable statutes of the State of Missouri (Sections 290.210 through 290.340 of the Revised Statutes of Missouri 2000, as amended), the City Charter, City ordinances including the “Complete Streets Policy” (City Ordinance 69955), when applicable, and the Revised Code of the City, as amended; requiring all specifications approved by the Board of Public Service and contracts let by authority of this Ordinance shall provide for: compliance with the Mayor’s Executive Orders on Equal Opportunity and maximum MBE/WBE/DBE utilization goals, except when superseded or prohibited by federal or state law or regulation; requiring that all contractor’s shall comply with the provisions of Sections 285.525 through 285.555 of the Revised Statutes of Missouri 2000, as amended, by requiring enrollment and participation in a federal work authorization program and agreeing not to knowingly employ unauthorized aliens; requiring that all contractor’s shall comply with the provisions of Section 292.675 of the Revised Statutes of Missouri 2000, as amended, by providing a ten-hour Occupational Safety and Health Administration construction safety program for their on-site employees; requiring that all contractor’s shall comply with the provisions of Section 34.057 of the Revised Statutes of Missouri 2000, as amended, (Prompt Payment/Retainage), as applicable; requiring the furnishing of a bond by every contractor on this public works project pursuant to the provisions of Section 107.170 of the Revised Statutes of Missouri 2000, as amended; requiring compliance with Section 34.353 of the Revised Statutes of Missouri 2000, as amended (Domestic Product Procurement Act – Buy American); requiring all advertisements for bids pursuant to this Ordinance be subject to the provisions of Section 8.250 of the Revised Statutes of Missouri 2000, as amended; appropriating the total estimated cost of the PROJECT of Three Million, Eight Hundred Thousand Dollars ($3,800,000.00) from various sources including the Federal Highway Administration Moving Ahead for Progress in the 21st Century (MAP-21), and various sources including the Metropolitan St. Louis Police Department, Downtown STL, Inc., and the Laclede Group; authorizing and directing the Comptroller of the City to draw warrants from time to time and disburse funds appropriated by this Ordinance and to receive and disburse grant funds in accordance with the Transportation Equity Act of the 21st Century (23 U.S.C. § 110, et seq.) upon the signature and certification of vouchers by the President of the Board of Public Service; and containing a public work emergency clause.

View Board Bill 285 details

03/04/2016 Final Passage Vote Results

This board bill was part of a consent vote along with BB 253, BB 260, BB 262, BB 263, BB 264, BB 274, BB 282, BB 285

Aye 21
No 0
Final Passage Vote
Ward Alderman Position
1 Sharon Tyus Aye
2 Dionne Flowers Aye
3 Freeman M Bosley Sr. Aye
5 Tammika Hubbard Aye
6 Christine Ingrassia Aye
9 Kenneth Ortmann Aye
11 Thomas A Villa Aye
12 Larry Arnowitz Aye
13 Beth Murphy Aye
14 Carol Howard Aye
15 Megan E Green Aye
16 Donna Baringer Aye
17 Joseph D Roddy Aye
18 Terry Kennedy Aye
19 Marlene E Davis Aye
20 Cara Spencer Aye
23 Joseph Vaccaro Aye
24 Scott Ogilvie Aye
25 Shane Cohn Aye
27 Chris Carter Aye
28 Lyda Krewson Aye
4 Samuel L Moore Absent
7 Jack Coatar Absent
8 Stephen Conway Absent
10 Joseph Vollmer Absent
21 Antonio D French Absent
22 Jeffrey L Boyd Absent
26 Frank Williamson Absent
President Lewis E Reed Absent

Was this page helpful?      



Comments are helpful!
500 character limit

Feedback is anonymous.