Design Stage Projects
Capital Improvements Projects that are in the design stage.
- Gravois Ave Traffic Study This project will develop a traffic safety report designed to improve multimodal safety along Gravois Ave from Jefferson Ave to Shenendoah Ave.
- Ivory Triangle Traffic Study The City of St. Louis is pursuing a traffic study at the Ivory Triangle location within the Patch Neighborhood, consisting of the Ivory St., Virginia Ave., Courtois St., Schirmer St., and Steins St. intersections.
- Lindell Boulevard Safety Improvements At the request of the 28th Ward Alderwoman, the Board of Public Service has contracted with CBB to provide traffic engineering design services for improvements proposed to Lindell Boulevard (Skinker to Kingshighway).
- South Broadway Cycle Track Improvements The City of St. Louis was awarded funding to construct an upgraded bike facility, as well as related road and sidewalk improvements, on approximately 2.1 miles of South Broadway between River City Casino Blvd. and Dover Street.
- Union-Lindell Bridge Reconstruction The intersection of Union and Lindell Boulevards, minor arterial streets, is supported on two independent bridge structures spanning Forest Park Parkway, an east-west principal arterial, and MetroLink light rail tracks.
Feedback is anonymous.